Design Process & 3D Rendering
8
min read

The Custom Scapes Design Process From Discovery Call to Install

Completed tiered retaining wall installation at the Ranallo Residence in Elgin, Illinois, built by Custom Scapes & Designs from the custom landscape design process.Completed tiered retaining wall installation at the Ranallo Residence in Elgin, Illinois, built by Custom Scapes & Designs from the custom landscape design process.
Written by
Custom Scapes & Designs
Published on
October 13, 2026

Custom Scapes & Designs landscape design process step-by-step — discovery call, site visit, 3D rendering, revisions, build. What to expect. Get a quote.

You're standing in your backyard, looking at a yard that's worked for years but isn't quite right anymore. You want to redo it. You've gotten as far as bookmarking ideas and walking the property with a tape measure. What happens next, exactly, when you call a landscape design firm? What does the process actually look like from your side of the table?

Most firms describe their process in vague terms because they don't want to commit to a structure. We're going to walk through ours in concrete detail — every step from the first phone call to the day the install crew packs up. If you're considering hiring Custom Scapes & Designs or any reputable design-build firm in DeKalb and Kane County, knowing what to expect at each phase changes how you show up to the meetings.

Phase 1: Discovery Call (15–30 minutes)

The first contact is a phone or video call. It's free and there's no obligation to proceed.

What we cover:

  • What you're hoping to build (specifically: backyard refresh? Full property? New patio? Drainage fix? Plant overhaul?)
  • Your property and location (so we know if you're in our service area and what climate/soil to expect)
  • Rough budget range (we'd rather have an honest range than no range — it lets us calibrate the design to what's actually buildable)
  • Timeline expectations (designing for next spring? This fall? Multi-year phase plan?)
  • Any specific pain points you want addressed (drainage, sun, screening, kid space, pet zones)

What we DON'T cover yet:

  • Specific plant recommendations
  • Material direction
  • Quoted prices
  • Design concepts

The discovery call is mutual scoping. By the end, both sides know whether the project fits our practice and whether we fit yours. If we're not the right firm — budget mismatch, scope mismatch, geography — we'll say so and recommend someone who is.

What you should do before the call:

  • Save a few Pinterest or Instagram photos of yards or features you love
  • Have a budget range in mind, even a rough one
  • Know your timeline (build next spring? Building this fall? Multi-year?)
  • Note your top pain points or wants

Phase 2: On-Site Walk-Through (60–90 minutes)

If the discovery call lands, we schedule an on-site visit. This is also free.

What happens during the walk:

  • Property walk with you (front yard, side yards, backyard, any specific zones)
  • Lifestyle conversation in context — "Where do you like to sit? When do you use this corner? Where do the kids play? Where does the dog hang out?"
  • Photography — we take dozens of photos of sightlines, existing conditions, drainage spots, sun exposure
  • Measurements — we measure the property, mark utilities, note structures
  • Sun exposure mapping — we note which areas get morning sun, afternoon sun, all-day shade
  • Drainage observation — we look at downspouts, low spots, slope direction
  • Tree assessment — every existing tree, what its status is, whether it stays or goes
  • Material conversation — we bring sample paver chips and stone samples for tactile reference

By the end of the visit, we have what we need to build the 3D model. You have a clearer sense of what's possible on your property.

What you should do before the visit:

  • Walk the property yourself in the days leading up and note anything you want to discuss
  • If you have a property survey, have it ready
  • Pick up the yard so we can see surfaces (toys, equipment, debris cleared from main view zones)
  • Have a question list — we'd rather you ask everything than save questions for later

Phase 3: Concept Development (Week 1–2)

Now we're back in the office, building.

What we produce:

  • Scaled 2D plans showing layout, hardscape dimensions, planting locations, lighting positions
  • First-pass 3D rendering of key views (kitchen window, back patio, front walk — the angles you actually look from)
  • Material direction (specific pavers and stone, edging style, lighting fixture types)
  • Initial planting palette
  • Preliminary line-item build estimate

What you're doing during this phase:

  • Not much from your end — we're in build mode
  • Sometimes we'll text or email a clarifying question ("Do you want the path lit or just the entry?" "Are we keeping the river birch?")
  • We schedule the next meeting for concept review

Phase 4: Concept Review (60–90 minutes, in person or video)

This is the most important meeting of the entire process. We walk you through the rendering.

What we cover:

  • Each rendered view, in sequence — what you see, what each element is, why we placed it there
  • Material choices — actual samples in hand, paired with the rendering for context
  • Plant palette — species names, what they look like at install, what they look like at maturity
  • Build estimate walk-through — line by line, so you understand what's costing what
  • Phasing discussion if relevant ("This is what year one looks like, year two adds the water feature")
  • Your honest reactions — things that feel right, things that feel off

The single most important thing you can do during this meeting: speak up when something doesn't sit right. Don't be polite. Don't assume we'll figure out what you actually want. If the wall feels too tall, say so. If the paver color reads wrong in your light, say so. If the plant placement feels off, say so. We can change everything in the rendering for free; we can't change it on install day for free.

Phase 5: Revisions (Week 3)

Most projects go through 1–2 revision rounds. We update the rendering, swap materials, move features, refine planting, and rerender. Sometimes the revisions are minor (swap the paver to one tone warmer); sometimes they're substantive (move the wall back 2 feet, change the patio shape).

Revisions included: typically 1–2 rounds in the standard fee. Beyond that, additional fees apply or we have an honest conversation about whether the scope has fundamentally changed (which is a different design package).

What you do during revisions:

  • Live with the rendering for a few days. Look at it morning, evening, after dinner. Ideas often surface after the meeting.
  • Run it past anyone whose sign-off you'll need (spouse, partner, HOA architectural board, family members)
  • Note specifically what you want changed for the revision conversation

Phase 6: Final Sign-Off (60 minutes)

The last design-phase meeting. We present the final rendering, final plans, final plant schedule, final material specs, and final build estimate.

What we cover:

  • Final renderings (day, plus night if lighting is significant)
  • Final 2D plans — construction-ready document
  • Plant schedule — every species, quantity, install size, mature size
  • Material specs — every paver, stone, edge restraint, lighting fixture by manufacturer and model
  • Final line-item build estimate — the price you sign
  • Build timeline — when the crew arrives, how long the build takes, what happens each phase
  • Contract for signature

At this meeting, the design is final and the contract for construction gets signed. Building scheduling locks in.

Phase 7: Pre-Mobilization (1–2 weeks before build)

Between contract signing and the crew arriving, several things happen:

  • Permits get pulled if needed
  • Materials get ordered (with sufficient lead time)
  • JULIE locates get scheduled
  • Crew gets confirmed for the build window
  • Any last logistics (gate access, dog plan, pool access, etc.) get worked out

You'll get a confirmation email 1–2 days before crew arrival with the exact start date and time.

Phase 8: Build (1–3 weeks, depending on scope)

The install happens. Walking through this in detail for a paver patio is in How a Paver Patio Actually Gets Installed in Northern IL. Most landscape installs follow a similar phased sequence — excavation, base or bed prep, construction in the correct order, planting, finishing.

What you do during build:

  • Be on site if you want — most homeowners enjoy watching the build, asking questions, learning about their property
  • Speak up immediately if you notice something that looks wrong. Don't save it for after the crew leaves.
  • Plan around the disruption (crew vehicles in driveway, equipment noise, dust)

We build through our hardscapes and landscape installation work — the build phase is where the design becomes reality.

Phase 9: Final Walk-Through and Handoff

When the build is complete, we walk the finished landscape with you. We document any final touch-up items, confirm everything matches the approved plan, and hand off:

  • Plant care guide (watering schedule, pruning notes, winter prep)
  • Hardscape care guide (sealing schedule for pavers, polymeric sand maintenance)
  • Lighting care guide (bulb replacement, seasonal adjustment)
  • Irrigation specs if installed (controller programming, zone map)
  • Warranty documentation

Phase 10: First-Year Follow-Up

A reputable design-build firm doesn't disappear after the install. We check in:

  • 30 days after install — anything settling? Any plants struggling?
  • Three to six months — first growing season check
  • One year — anything covered under warranty? Anything you'd want adjusted?

The first year is when most install-related issues surface (a plant that didn't take, a paver that's settled slightly, a drainage area that didn't perform as expected). We handle these proactively.

Frequently Asked Questions

How long does the landscape design process take?

Most residential designs run 2–4 weeks from kickoff to final sign-off. Week one covers the discovery call and on-site visit. Weeks two and three produce concept design and 3D rendering. The final week handles 1–2 revision rounds before sign-off. Complex multi-phase projects with extensive hardscape or engineered drawings can extend to 6–8 weeks.

What happens after design sign-off?

The construction contract gets signed, permits are pulled, materials are ordered, JULIE locates are scheduled, and the crew is booked. Pre-mobilization typically takes 1–2 weeks for residential projects. Then the build crew arrives and the install runs 1–3 weeks for most projects.

What if I want changes after the design is signed off?

Minor changes during build can usually be accommodated as change orders with associated cost. Major scope changes (rethinking the patio shape, redoing the planting plan) typically require returning to the design phase for revised renderings and a revised estimate. The cheap time to make changes is during the rendering phase — not during build.

Do I need to be home during the install?

No, but it helps to be available for questions during the build. We'll have access (gate codes, key location, etc.) worked out before crew arrival. Many homeowners enjoy being on site at least part of the time to see the build progress and ask questions about what's happening.

What's the most common reason a project doesn't go smoothly?

Homeowner reluctance to speak up during the rendering review. If something feels off during design and the homeowner doesn't say so, it shows up on install day — and changing it then costs real money. The single most important practice during design is honest feedback during the rendering review. We can change anything for free at that point.

Can I phase the build over multiple years?

Yes, and we encourage it for larger projects. The design package includes a phasing plan if relevant. Common phasing: Year 1 patio and primary hardscape, Year 2 planting, Year 3 water feature or lighting. Phasing lets you spread cost, evaluate each phase before committing to the next, and adjust later phases based on how earlier ones perform.

How much does design cost in your model?

For build clients, the design package is included. For design-only clients, fees range from $1,500 for a single-zone refresh to $15,000+ for complex multi-phase work. We quote design-only with clear scope and fee before any paid time begins. See Landscape Design Cost in DeKalb & Kane County for the broader market ranges.

The Bottom Line

The Custom Scapes & Designs process is structured and concrete: discovery call, site visit, concept and 3D rendering, review, revisions, sign-off, pre-mobilization, build, final walk-through, first-year follow-up. Every phase has a clear purpose, a defined deliverable, and clear expectations on both sides.

The single highest-leverage moment in the entire process is the concept review meeting — when you walk through the 3D rendering and have the chance to speak up about anything that feels off. Changes are free at that point. They get expensive fast on install day.

If you're considering working with us, the right first step is the discovery call. It's free, it's 15–30 minutes, and by the end we'll both know if the project is a fit.